Walkway Test Sinks Interior’s $646,000 Bill for Inspecting Gulf Oil Caissons

Offshore operators billed per structure for federal safety inspections gained a useful precedent on Nov. 25, 2026, when the U.S. Court of Appeals for the Fifth Circuit threw out $646,000 in inspection fees Interior had assessed against Medco Energi US, L.L.C. The court held that regulators cannot treat a cluster of small platforms as separate “facilities” simply because no walkway links them to the main one.

The unsigned opinion in Medco Energi US, L.L.C. v. Cantor, No. 25-30201, came from Judges Priscilla Richman, Stephen Higginson and Andrew Oldham. It reverses a Western District of Louisiana summary judgment for the government and remands.

Nineteen Caissons, One Hub

The dispute centers on MP 64, a federal lease unit off Louisiana once run by Medco: a central processing platform tied by subsea lines to 19 caissons, the small structures that house well equipment. Only one caisson connects to the hub by walkway; inspectors reach the rest by boat. After inspections in 2016 and 2017, the Bureau of Safety and Environmental Enforcement counted each structure as its own facility at $17,000 apiece. Interior later dropped the walkway-linked caisson and some defunct wells from the tally, but kept 18 separate charges.

The governing regulation, 30 C.F.R. § 250.105, starts from a default that a central installation and its satellites form a single facility. A regional supervisor may split them only after finding that “the complexity of the individual installations” warrants it. The panel found that Interior never made that assessment. Its regional supervisor admitted he evaluated none of the caissons individually and relied instead on an in-house practice tied to walkways and travel distance.

Because the regulation already treats installations without walkways as one facility by default, the court reasoned, the lack of a walkway cannot by itself justify separate billing. The panel also refused to defer to the agency under Kisor v. Wilkie, noting that the walkway approach had never been formally adopted and did not draw on any inspection expertise. “An agency cannot acquire regulatory power through adverse possession,” the court wrote.

A Win for Interior on Stopgap Funding

Medco lost its broader argument. The company contended that the January 2017 and January 2018 fee demands fell into gaps between full-year spending bills, when only continuing resolutions were in effect, and that those resolutions never mentioned inspection fees. The panel disagreed. It held that the stopgap measures carried forward the whole inspection program “under the authority and conditions” of the prior year’s appropriations, fee collection included. Congress, the court said, would have spelled it out had it meant to fund inspections while cutting off the fees that pay for them.

What It Means for Operators

Interior keeps its power to collect inspection fees during budget standoffs. But in the Fifth Circuit, where most Gulf production is litigated, any decision to bill satellite structures separately must now rest on a documented, structure-by-structure look at their complexity, not on how inspectors get from one to the next.

Sources